03 Nov 2020
16:45
 - 17:10 BST (UTC +01:00)
Presentation
CHARGING INFRASTRUCTURE

How the Alabama A&M University is Electrifying its Campus Transport and Infrastructure

  • Pitching for and investing a $1.7 million grant to support the purchase of EVs and infrastructure
  • Procuring and deploying the first 6 Electric buses to develop a fully electric fleet
  • Redesigning the university campus to deploy an infrastructure network and support an electric fleet including both charge points and integrated renewable energy sources
Director
Alabama A&M University